"Progress Report on the Demolition Project of Nanhua Private Renji Hospital in Jiangcheng City"

Date: March 2nd

The work carried out today involved initial planning for the demolition. We mainly used detection equipment to inspect each of the hospital's wards. The inspection was originally slated to finish before four o'clock in the afternoon, but calibrating the equipment took longer than expected. It was not until nine o'clock in the evening that all inspection work was finally completed.

The foundation of the building was not very solid, and corrosion had appeared in the steel-reinforced concrete of the foundation. Multiple voids were detectable, and the underground parking garage had severe water leakage. It is recommended to prepare for the prevention of building collapse during demolition.

Reporter: Wang Yuan

...

Date: March 7th


This is the end of Part One, and download Webnovel app to continue:

Scan the QR code to download Webnovel

Load failed, please RETRY

Gifts

Gift -- Gift received

    Weekly Power Status

    Rank -- Power Ranking
    Stone -- Power stone

    Batch unlock chapters

    Table of Contents

    Display Options

    Background

    Font

    Size

    Chapter comments

    Write a review Reading Status: C136
    Fail to post. Please try again
    • Translation Quality
    • Stability of Updates
    • Story Development
    • Character Design
    • World Background

    The total score 0.0

    Review posted successfully! Read more reviews
    Vote with Power Stone
    Rank NO.-- Power Ranking
    Stone -- Power Stone
    Report inappropriate content
    error Tip

    Report abuse

    Paragraph comments

    Login